Save these instructions, 1a 2a, 1a 2b – LBL Lighting 2-Circuit MO Direct Feed Canopy User Manual

Page 2: 1a 2c

Advertising
background image

2

Install the 2-Circuit Monorail to the
Power Feed Canopy

SCREW

POWER FEED CAP

POWER FEED
HOUSING

POWER FEED CAP

2-CIRCUIT MONORAIL

POWER FEED
HOUSING

MIDDLE
CONTACT

Remove the power feed cap from the power feed housing.

Completely back out the screw on the power feed cap.

Loosen

the knurled cap on the power

(Do Not Remove)

feed housing and pull the middle contact wire slightly out so

that the middle contact is not exposed in power feed housing.

NOTE:

The standoffs should be installed to support the

2-Circuit Monorail while connecting 2-Circuit Monorail to
the power feed canopy. Refer to the instructions provided
with the standoffs.

Place a 2-Circuit Monorail section into the standoffs and

power feed housings.

Screw the power feed cap completely to the power feed

housing. Make sure that the power feed cap is not cross
threaded.

Tighten the screw on the power feed cap for proper power

connection.

Tighten the knurled cap for proper power connection.

POWER FEED CAP

SCREW

KNURLED CAP

HOT 1

HOT 2

COM

7400 Linder Ave, Skokie, IL 60077

800.323.3226 - 847.626.6300

www.lbllighting.com

© 2014 LBL Lighting.All rights reserved.The "LBL Lighting" graphic is a
registered trademark of LBL Lighting. LBL Lighting reserves the right to
change specifications for product improvements without notification.

A Generation Brands Company

SAVE THESE INSTRUCTIONS!

A Generation Brands Company

1

1A

2A

2

1

2

3

7

6

3

4

5

1A

2B

4

5

6

1A

2C

7

Advertising