Install the 2-circuit monorail, Adjust standoff height (optional), 4a 1a – LBL Lighting 2-Circuit MO Rigid Standoff User Manual
Page 3: 5a 1a 5b
Advertising
Install the 2-Circuit Monorail
Remove the housing cap on all standoffs.
1
HOUSING CAP
Place a section of the Monorail into standoff housings.
While supporting the Monorail, tighten the housing cap
completely to the standoff housings to secure the
Monorail in place.
Repeat these steps for each standoff.
MONORAIL
3
Adjust Standoff Height (Optional)
Slightly loosen
the M3 set screw on the
(Do Not Remove)
side of the telescoping post with th 1.5 MM Allen wrench
provided.
Adjust standoff height and tighten M3 set screw with 1.5 MM
Allen wrench.
Repeat these steps for each standoff.
TELESCOPING POST
M3 SET
SCREW
1.5MM ALLEN
WRENCH
1
NOTE:
In case of cross threading, loosen the cap and
repeat step 3.
STANDOFF HOUSING
HOUSING CAP
1A
1
2
3
4A
1A
1
2
5A
1A
5B
3
4
1
2
3
Advertising