Install the 2-circuit monorail, Adjust standoff height (optional), 4a 1a – LBL Lighting 2-Circuit MO Rigid Standoff User Manual

Page 3: 5a 1a 5b

Advertising
background image

Install the 2-Circuit Monorail

Remove the housing cap on all standoffs.

1

HOUSING CAP

Place a section of the Monorail into standoff housings.

While supporting the Monorail, tighten the housing cap

completely to the standoff housings to secure the

Monorail in place.

Repeat these steps for each standoff.

MONORAIL

3

Adjust Standoff Height (Optional)

Slightly loosen

the M3 set screw on the

(Do Not Remove)

side of the telescoping post with th 1.5 MM Allen wrench

provided.

Adjust standoff height and tighten M3 set screw with 1.5 MM

Allen wrench.

Repeat these steps for each standoff.

TELESCOPING POST

M3 SET
SCREW

1.5MM ALLEN
WRENCH

1

NOTE:

In case of cross threading, loosen the cap and

repeat step 3.

STANDOFF HOUSING

HOUSING CAP

1A

1

2

3

4A

1A

1

2

5A

1A

5B

3

4

1

2

3

Advertising