Rack-mount installation – APC NETBOTZ NBRK0200 User Manual

Page 11

Advertising
background image

7

NetBotz Rack Monitor 200 Installation and Quick Configuration Manual

Rack-mount installation

1. Choose a location for the Rack Monitor 200 in the front or rear of the rack.

The Rack Monitor 200 occupies one U-space. A notched hole or a number
on the vertical rail of the rack denotes the middle of a U-space.

Caution: To avoid equipment damage, use only the hardware provided
when installing the brackets.

2. Install the brackets (

 and ), including

the power cord retainer bracket, on the end
nearest the AC Line Inlet.

3. Secure the Rack Monitor 200 to the rack,

using cage nuts and screws (provided with
the rack).

4. See “Power cord and network cable

connections” on page 8.

8-32 x 1/4-in Phillips-head screws

Bracket

Power cord retainer bracket

AC Line Inlet

Advertising