Maintenance – Avalon Stoves Arbor PS User Manual

Page 33

Advertising
background image

Maintenance

3 3

© Travis Industries

4070806

1 0 0 - 0 1 1 9 1 _ 0 0 0

Bi-Weekly Maintenance (or every 10 bags of pellets) - continued

Check Ashpan, Dispose if necessary

WARNING

: Make sure the heater has fully cooled (approximately 25 minutes) before conducting service.

WARNING

: The ashpan must be in place while the heater is in use.

Twist the ashpan

handle clockwise.

A handle is provided
on the ashpan to

remove the ashes.

Lift up on the
ashlip and slide

the ashpan

forward.

Disposal of Ashes – Ashes should be placed in a metal container with a tight fitting lid. The closed

container of ashes should be placed on a noncombustible floor or on the ground, well
away from all combustible materials, pending final disposal. If the ashes are disposed of
by burial in soil or otherwise locally dispersed, they should be retained in the closed
container until all cinders have been thoroughly cooled.

Clean the Glass

Open the doors and clean the glass with a non-abrasive glass cleaner and rag.

Advertising