Marking the wall locations for the screw holes – Allied Telesis AT-SBx3106WMB User Manual
Page 26

Installation Instructions
26
Marking the Wall Locations for the Screw Holes
To mark the screw holes for the brackets on the wall, perform the following
procedure:
1. Position one of the wall brackets as the top bracket in the reserved
wall area for the chassis. (Either bracket can be the top bracket
because they are identical.)
Please review the following guidelines as you position the bracket on
the wall:
The bracket must be level with the floor.
The minimum dimensions of the reserved area around the bracket
are given in Figure 8. There must not be any objects or other
devices within the area.
Figure 8. Minimum Area Dimensions When Positioning the Bracket on the
Wall
The reserved area in Figure 8 is for the chassis if it will have AC
power supplies. If the chassis will have DC power supplies, you
may reduce the reserved area for the back panel (left side) from
14.5 cm
(5 11/16 in.)
50.8 cm
(20 in.)
66.0 cm
(26 in.)
30.5 cm
(12 in.)