Chapter 2, Installation, R 2: installation – Allied Telesis AT-GS950/24 User Manual
Page 25
Advertising

25
Chapter 2
Installation
This chapter contains the following sections:
“Reviewing Safety Precautions” on page 26
“Selecting a Site for the Switch” on page 28
“Cable Specifications” on page 29
“Unpacking the Switch” on page 30
“Installing the Switch on a Desktop” on page 31
“Installing the Switch in an Equipment Rack” on page 32
“Installing an Optional SFP Transceiver” on page 34
“Cabling the Switch” on page 37
Advertising
This manual is related to the following products: