Powering on the switch, Figure 19. plugging in the ac power cord – Allied Telesis AT-FS750/48 User Manual
Page 48
Advertising

Chapter 2: Installation
48
Powering On the
Switch
To power on the switch, perform the following procedure:
1. Plug the power cord into the AC power connector on the back of the
switch, as shown in Figure 19.
Figure 19. Plugging in the AC Power Cord
2. Plug the other end of the power cord into a wall outlet.
3. Verify that the POWER LED is green. If the LED is off, refer to
Chapter 3, “Troubleshooting” on page 51.
The switch is now powered on and ready for network operations. To
start a local management session on the switch, refer to “Starting a
Management Session” on page 49. For more information about staring
a remote management session, see the AT-S105 Management
Software User’s Guide.
100-240V
AC
~
50-60Hz
1727
Advertising