Installing the switch in a rack, Figure 8. attaching the mounting brackets, Chapter 2: installation 38 – Allied Telesis AT-GS900/8POE User Manual
Page 38: Class 1 lase r pro duct, Pd on pd er r link act clas s 1 laser pro duct

Chapter 2: Installation
38
Installing the Switch in a Rack
To install the switch in a rack, perform the following procedure:
1. If attached, remove the rubber feet using a flat-head screwdriver.
2. Attach a mounting bracket (provided) to each side of the switch using
the bracket mounting screws (provided), as shown Figure 8.
Figure 8. Attaching the Mounting Brackets
3. Mount the switch on a 19-inch rack using the screws (not provided), as
shown in Figure 9.
965
POWE
R
1
2
3
4
5
6
7
8R
PoE
CLASS
1
LASE
R PRO
DUCT
1000B
ase-X
AT-G
S900/
8POE
8 Port 10
/100/1
000 M
bps PO
E Sw
itch with 1
Com
bo SFP P
ort
PD O
N
PD E
RROR
1000
LINK
ACT
10/100
LIN
K
ACT
PO
RT AC
TIVITY
8
SFP
776
AT-FS
708/P
OE
8 po
rt 10/100
TX Unma
nage
d POE
Switc
h w
/1 SFP
port
POWER
1
2
3
4
5
6
7
8
PoE
SFP
UPLIN
K POR
T
PD ON
PD ER
R
LINK
ACT
CLAS
S 1
LASER PRO
DUCT
1000Ba
se-X