Unpacking the switch – Allied Telesis AT-GS900/24 User Manual

Page 26

Advertising
background image

Chapter 2: Installation

26

Unpacking the Switch

To unpack an AT-GS900/16 or an AT-GS900/24 switch, perform the
following procedure:

1. Remove all components from the shipping package.

Note

Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.

2. Place the switch on a level, secure surface.

3. Ensure the following hardware components are included in your switch

package. If any item is missing or damaged, contact your Allied
Telesis sales representative for assistance.

ˆ

One AT-GS900/16 or AT-GS900/24 Fanless Gigabit Ethernet
switch

ˆ

Two rackmounting brackets

ˆ

Eight flathead Phillips screws

ˆ

Four #10-32 Phillips screws with a nylon washer

ˆ

Four self-adhesive rubber feet

ˆ

AC power cord

ˆ

Documentation CD

Advertising
This manual is related to the following products: