Allied Telesis FastHub16 User Manual
Page 14
Advertising

Installation
8
4. Pry off the interlock cap at each corner of the unit. Refer to Figure 4. From
the side of the unit, insert the tip of a small straight-slot screwdriver into
the opening of the interlock cap. Press down on the screwdriver to pry the
cap off.
Figure 4 Interlock Cap
5. Place the next unit over the base unit, aligning with the interlock cap and
press down on each corner to snap the units together.
6. Repeat steps 4 and 5 until all units are in the assemblage.
7. Continue with “Powering on the Hub.”
Advertising
This manual is related to the following products: