9. The gas supply and unit’s installation must conform with local codes or in the

absence of local codes, with the National Fuel Gas Code, ANSI Z223.1/NFPA

54 (current edition), or the Natural Gas and Propane Installation Code CSA

149.1(current edition), as applicable. Additionally following must be complied

with: THE AREA DIRECTLY AROUND THE APPLIANCE MUST BE CLEARED OF

ALL COMBUSTIBLE MATERIAL. FAILURE TO FOLLOW THESE INSTRUCTIONS

CAN CAUSE BODILY INJURY AND /OR PROPERTY DAMAGE. The appliance and

its individual shut-off valve must be disconnected from the gas supply piping

system during any testing at pressures in excess of ½ PSI (3.45 kPa). The

appliance must be isolated from the gas supply piping system by closing its

individual manual shut-off valve during any pressure testing at or less than ½

PSI (3.45 kPa).

10. Confirm that the jacket water level is between the gauge glass markers or inside

the sight glass port. If the level is low, follow instructions under “Jacket Filling

and Water Treatment,” Page 16.

11. The open end of the elbow on the outlet of the safety valve must face downward.

If it does not, turn it to the correct position.

12. For units with optional tangent draw-off, assemble the tangent draw-off by

placing the large nut over the draw-off valve and inserting it into the draw-off

tube. ONLY HAND-TIGHTEN THE NUT to complete installation.

13. Now that the kettle has been installed, you should test to ensure that it is

operating correctly.

a. Remove literature and packing materials from inside and outside of the

unit.

b. If the unit is equipped with a draw-off valve (product outlet), clean out any

material which might clog or damage the draw-off.

c. Confirm that the tilting mechanism is operating properly by tilting the kettle

through its full range. Then return the kettle to the upright position.

e. Turn on the electrical service to the unit.

f. Pour 1-2 quarts of water into the kettle.

g. Following “To Start Kettle” instructions in the “Operation” section (Page

9), begin heating the water at the highest thermostat setting. The heat

indicator light should come on, and heating should continue until the boils.

14. If the unit functions as described it is ready for use. If it does not function as

described, contact your local Authorized Service Agency.

Installation

WARNING

DO NOT CONNECT ANY PIPING TO

THE PRESSURE RELIEF VALVE. THE VALVE

MUST BE FREE TO VENT STEAM AS
NEEDED. IMPROPER INSTALLATION

WILL VOID THE WARRANTY! THE ELBOW

ATTACHED TO THE PRESSURE RELIEF

VALVE MUST POINT TO THE FLOOR.

The open end of the pressure relief

valve elbow must face downward.

WARNING

DO NOT STAND ON OR APPLY

UNNECESSARY WEIGHT OR PRESSURE ON

THE KETTLE FRONT OR POURING LIP. THIS

COULD RESULT IN THE OVERLOAD AND

FAILURE OF THE TILT MECHANISM, AND

POSSIBLE SERIOUS INJURY AND BURNS TO

THE OPERATOR AND OTHERS.

Each day confirm the jacket water

level by checking the water gauge.

When attaching the draw-off

valve hand tighten the nut.