4

S-20~125FM3HPQ

Urban Multi air conditioner

4PW15114-1A

Be sure to use both a spanner and torque wrench together when
connecting or disconnecting pipes to/from the unit.

Refer to Table 1 for the dimensions of flare nut spaces and the
appropriate tightening torque. (Overtightening may damage the
flare and cause leaks.)

Table 1

When connecting the flare nut, coat the flare both inside and
outside with ether oil or ester oil and initially tighten by hand 3 or
4 turns before tightening firmly.
Coat here with ether oil or ester oil

Check the pipe connector for gas leaks, then insulate it.

D

RAIN

PIPING

WORK

Rig the drain piping as shown in the figure and take measures
against condensation. Improperly rigged piping could lead to leaks
and eventually wet furniture and belongings.

1

Install the drain pipes.

-

Keep piping as short as possible and slope it downwards so
that air may not remain trapped inside the pipe.

-

Keep pipe size equal to or greater than that of the connecting
pipe (vinyl pipe of 25 mm nominal diameter and 32 mm outer
diameter).

-

Use the supplied drain hose and metal clamp. Tighten the
clamp firmly.

Insulate the drain hose inside the building.

If the drain hose cannot be sufficiently set on a slope, fit the
hose with drain raising piping (field supply).

HOW TO PERFORM PIPING (See figure 8)

Connect the drain hose to the drain raising pipes, and insulate
them.

Connect the drain hose to the drain pipe on the indoor unit, and
tighten it with the metal clamp.

-

To ensure a downward slope of 1:100, install hanging bars
every 1 to 1.5 m.

-

If unifying multiple drain pipes, install the pipes as shown in
figure 9.

2

After piping work is finished, check if drainage flows smoothly.

-

Open the water inlet lid, add approximately 1 l of water
gradually and check the drainage flow. (See figure 10)

1

Torque wrench

2

Spanner

3

Piping union

4

Flare nut

Pipe

gauge

Tightening torque

Flare dimension

A (mm)

Flare shape

Ø6.4

14.2~17.2 N•m

(144~176 kgf•cm)

8.7~9.1

Ø9.5

32.7~39.9 N•m

(333~407 kgf•cm)

12.8~13.2

Ø12.7

49.5~60.3 N•m

(504~616 kgf•cm)

16.2~16.6

Ø15.9

61.8~75.4 N•m

(630~770 kgf•cm)

19.3~19.7

1

Liquid pipe

2

Gas pipe

3

Insulation for fitting of liquid line
(supplied with the unit)

4

Insulation for fitting of gas line
(supplied with the unit)

5

Clamps (use 2 clamps per
insulation)

2

3

1

4

R=0.4~0.8

45

° ±

2

90

°±

2

A

5

3

1

2

4

1

Hanging bar

1

Metal clamp

2

Drain hose

3

White tape (field
supply)

1

Ceiling slab

2

Hanging bar

3

Adjustable range

4

Drain hose (supplied with the unit)

5

Metal clamp (supplied with the unit)

6

Drain raising pipe (field supply)

Installation

A

Rear suction installation

275

When canvas duct is installed

350-530

When air inlet panel is directly installed

275

1

Multiple drain piping

1

Water inlet

2

Portable pump

3

Water inlet lid

4

Bucket (adding water from water inlet)

5

Drain outlet for maintenance (with rubber drain plug)

6

Refrigerant pipes

1-1.5 m

1

2

1

3

Advertising
This manual is related to the following products: