Specifications – Panasonic 36PSU1U6 User Manual

Page 126

Advertising
background image

1-120

1. Specifications

Do not use a spanner to tighten the valve stem caps.

Doing so may damage the valves.

Depending on the installation conditions, applying

excessive torque may cause the nuts to crack.

Precautions for Packed Valve Operation

If the packed valve is left for a long time with the valve

stem cap removed, refrigerant will leak from the valve.
Therefore, do not leave the valve stem cap removed.

Use a torque wrench to securely tighten the valve stem

cap.

Valve stem cap tightening torque:

Charging port

70 – 85 in.lbs (80 – 100 kgf • cm)

ø3/8

"

(Liquid side)

160 – 180 in.lbs (190 – 210 kgf • cm)

ø5/8

"

(Gas side)

240 – 270 in.lbs (280 – 320 kgf • cm)

3. Insulating the Refrigerant Tubing

Tubing Insulation

Thermal insulation must be applied to all unit tubing,

including the distribution joint (purchased separately).
* For gas tubing, the insulation material must be heat
resistant to 248°F or above. For other tubing, it must be
heat resistant to 176°F or above.
Insulation material thickness must be 13/32 in. or greater.

CAUTION

If the exterior of the outdoor unit
valves has been fi nished with a
square duct covering, make sure
you allow suffi cient space to
access the valves and to allow
the panels to be attached and
removed.

Taping the fl are nuts

Wind the white insulation tape around the fl are nuts at the
gas tube connections. Then cover up the tubing
connections with the fl are insulator, and fi ll the gap at the
union with the supplied black insulation tape. Finally, fasten
the insulator at both ends with the supplied vinyl clamps.
(Fig. 1-119)

Insulation material

The material used for insulation must have good insulation
characteristics, be easy to use, be age resistant, and must
not easily absorb moisture.

CAUTION

After a tube has been insulated,
never try to bend it into a narrow
curve because it can cause
the tube to break or crack.

Fig. 1-117

Fig. 1-118

Fig. 1-119

Never grasp the drain or refrigerant connecting
outlets when moving the unit.

Charging port

Valve stem cap

Valve stem

Main valve

Packed valve

2 tubes arranged together

Inter-unit
control wiring

Gas tube

Liquid tube

Armoring tape

Insulation

Unit side
insulator

Insulation tape (white)

(supplied)

Sealer (supplied)

Flare insulator (supplied)

Tube insulator
(not supplied)
Heat resistant
248°F or above

Vinyl clamps (supplied)

Flare nut

1

SM830203-01_PAC-i_US-letter.indb120 120

SM830203-01_PAC-i_US-letter.indb120 120

2012/01/19 22:39:36

2012/01/19 22:39:36

Advertising
This manual is related to the following products: