Specifications – Panasonic 36PSU1U6 User Manual

Page 127

Advertising
background image

1-121

1. Specifications

4. Taping the Tubes

(1) At this time, the refrigerant tubes (and electrical

wiring if local codes permit) should be taped
together with armoring tape in 1 bundle. To
prevent condensation from overfl owing the drain
pan, keep the drain hose separate from the
refrigerant tubing.

(2) Wrap the armoring tape from the bottom of the

outdoor unit to the top of the tubing where it
enters the wall. As you wrap the tubing, overlap
half of each previous tape turn.

(3) Clamp the tubing bundle to the wall, using 1

clamp approx. each meter (3 feet). (Fig. 1-120)

NOTE

Do not wind the armoring tape too tightly since this
will decrease the heat insulation effect. Also ensure
that the condensation drain hose splits away from the
bundle and drips clear of the unit and the tubing.

5. Finishing the Installation

After fi nishing insulating and taping over the tubing,
use sealing putty to seal off the hole in the wall to
prevent rain and draft from entering. (Fig. 1-121)

Fig. 1-120

Fig. 1-121

Inter-unit
control wiring

Gas tube

Liquid tube

Armoring tape

Insulation

Tubing

Apply putty here

1

SM830203-01_PAC-i_US-letter.indb121 121

SM830203-01_PAC-i_US-letter.indb121 121

2012/01/19 22:39:36

2012/01/19 22:39:36

Advertising
This manual is related to the following products: