Panasonic FV-05VFL2 User Manual

Page 8

Advertising
background image

3. Follow steps 5 to 7 of the installation (page 7) to

complete the duct work and wiring.

I

8

9. Insert the plug connector

and plug connector

into the receptacle

and receptacle

respectively,

and secure the light unit to the fan unit with 2 screw

(M4X16) and 1 machine screw (M4X8). (Fig.6)

II

III

II

III

III

10. Insert the fluorescent lamps and screw the night

lamp into the light unit.(Fig.6)

11. Insert mouting springs into slots as shown

and mount grille to fan body.(Fig.7)

Slot

Grille

Mounting spring

Fig.7

Light unit

1. Disconnect plug connector from receptacle and

remove adaptor from fan body before starting
installation.

2. Insert the suspension bracket into the adaptor and

secure it to joists by using long screws(M4X30) (Fig.8)
Keep the distance B (7/8 inch, 21.6mm) for the
thickness of ceiling board.

If spacing A between joists is 21 1/4 to 23 1/2
inches (540mm~597mm), connect suspension
bracket

and

(C4 mark to C4 mark) according

to page. 8 Select the suspension bracket according
to spacing A as show below.

II

III

suspension
bracket

suspension
bracket

I

suspension
bracket

III

suspension
bracket

&

II III

8. Finish ceiling work. Ceiling hole should be aligned

with the edge of the flange. (Fig.6)

Ceiling

Joists

2-Long screws
(M4X30)

2-Long screws(M4X30)

Adaptor

Adaptor

B

A

inches mm

(

)

Fig.8

13 1/4~15 1/2 ( 336~394 )
16 1/2~18 3/4 ( 419~480 )
21 1/4~23 1/2 ( 540~597 )

Suspension bracket

Fig.6

10

7/8

(275)

Machine screw
(M4X8)

screw

(M4X16)

III

Light unit

Plug connector

III

Plug connector

II

Ceiling

10

7/8

(275)

inches (mm)

Plug connector

III

Plug connector

II

Receptacle

III

Receptacle

II

4 W Night Lamp

Fluorescent lamps

Spacing A
between Joists
inches (mm)

13 1/4~15 1/2

( 336~394 )

16 1/2~18 3/4

( 419~480 )

21 1/4~23 1/2

( 540~597 )

Advertising