Panasonic FV-05VFL2 User Manual
Page 8
3. Follow steps 5 to 7 of the installation (page 7) to
complete the duct work and wiring.
I
8
9. Insert the plug connector
and plug connector
into the receptacle
and receptacle
respectively,
and secure the light unit to the fan unit with 2 screw
(M4X16) and 1 machine screw (M4X8). (Fig.6)
II
III
II
III
III
10. Insert the fluorescent lamps and screw the night
lamp into the light unit.(Fig.6)
11. Insert mouting springs into slots as shown
and mount grille to fan body.(Fig.7)
Slot
Grille
Mounting spring
Fig.7
Light unit
1. Disconnect plug connector from receptacle and
remove adaptor from fan body before starting
installation.
2. Insert the suspension bracket into the adaptor and
secure it to joists by using long screws(M4X30) (Fig.8)
Keep the distance B (7/8 inch, 21.6mm) for the
thickness of ceiling board.
If spacing A between joists is 21 1/4 to 23 1/2
inches (540mm~597mm), connect suspension
bracket
and
(C4 mark to C4 mark) according
to page. 8 Select the suspension bracket according
to spacing A as show below.
II
III
suspension
bracket
suspension
bracket
I
suspension
bracket
III
suspension
bracket
&
II III
8. Finish ceiling work. Ceiling hole should be aligned
with the edge of the flange. (Fig.6)
Ceiling
Joists
2-Long screws
(M4X30)
2-Long screws(M4X30)
Adaptor
Adaptor
B
A
inches mm
(
)
Fig.8
13 1/4~15 1/2 ( 336~394 )
16 1/2~18 3/4 ( 419~480 )
21 1/4~23 1/2 ( 540~597 )
Suspension bracket
Fig.6
10
7/8
(275)
Machine screw
(M4X8)
screw
(M4X16)
III
Light unit
Plug connector
III
Plug connector
II
Ceiling
10
7/8
(275)
inches (mm)
Plug connector
III
Plug connector
II
Receptacle
III
Receptacle
II
4 W Night Lamp
Fluorescent lamps
Spacing A
between Joists
inches (mm)
13 1/4~15 1/2
( 336~394 )
16 1/2~18 3/4
( 419~480 )
21 1/4~23 1/2
( 540~597 )