Operation, Electrical shock & fire hazard, Final installation steps – COOK Gemini User Manual

Page 4

Advertising
background image

4

Gemini 800 - 900 Series:

White

Line

Line

Black (High)
Blue (Medium)
Red (Low)

Electrical Shock & Fire Hazard:

Insulate Unused Leads Separately
Failure to follow these instructions could result in

death or serious injury.

Gemini 1000:

White

Line 2

Line 1

Yellow

Purple

Orange

Insulate

Brown

Yellow

Line 2

Line 1

Brown

Purple

Orange

Insulate
Insulate

White

1 PH / 60 HZ / 115V

MARATHON 6.0 AMPS

1 PH / 60 HZ / 208-230 V

MARATHON 2.8-3.0 AMPS

White

Line 2

Line 1

Red

Black

Blue

Insulate

Orange

Yellow

Line 2

Line 1

Insulate

Blue

Purple

Orange

White

1 PH / 60 HZ / 115V

MAGNETEK 8.0 AMPS

1 PH / 60 HZ / 208-230 V

MAGNETEK 4.1 AMPS

T4

Insulate

P4
T5

Insulate

P6

T6

Insulate

P6

T1
T7
T2
T8

T3
T9

3 PH / 60 HZ / 208-230 V

MARATHON 2.2-2.0 AMPS

MAGNETEK 2.2-2.0 AMPS

Line 2

Line 1

Line 3

T4

Insulate

T7
T6

Insulate

T9

T5

Insulate

T8

T1
T2
T3
P4

P5
P6

3 PH / 60 HZ / 460 V

MARATHON 1.0 AMP

MAGNETEK 1.0 AMP

Line 2

Line 1

Line 3

Insulate

Insulate

Insulate

Gemini 2000:

Brown

Line 2

Line 1

Blue

Purple

White

Insulate

Black

Brown

Line 2

Line 1

Blue

Orange

White

Insulate

Insulate

Black

1 PH / 60 HZ / 115V

MARATHON 10.8 AMPS

1 PH / 60 HZ / 208-230 V

MARATHON 6.0-5.4 AMPS

P2

Line 2

Line 1

T3

P1

T2

Insulate

T4

T5

T5

P2

Insulate

Line 1

Insulate

T3

P1

Line 2

T2

T4

1 PH / 60 HZ / 115 V

LEESON 10.2 AMPS

1 PH / 60 HZ / 208-230 V

LEESON 5.2 AMPS

T4

Insulate

P4
T5

Insulate

P6

T6

Insulate

P6

T1
T7
T2
T8

T3
T9

Line 2

Line 1

Line 3

3 PH / 60 HZ / 208-230 V

MARATHON 4.1-4.2 AMPS

LEESON 3.4 AMPS

T4

Insulate

T7
T6

Insulate

T9

T5

Insulate

T8

T1
T2
T3
P4

P5
T6

3 PH / 60 HZ / 460 V

MARATHON 2.1 AMPS

LEESON 1.7 AMPS

Line 2

Line 1

Line 3

Insulate

Insulate

Insulate

FSC:

White

Fan

Black

FSC

Time Delay Switch:

White

Black

Red

Blue

Fan

light

Switch

Final Installation Steps

1. Inspect fasteners and setscrews, particularly fan

mounting fasteners, and tighten as required.

2. Inspect for correct amperage and voltage with an

ammeter and voltmeter.

3. Ensure blower is secured to duct work.

4. Ensure all accessories are installed.

5. Inspect wheel-to-inlet clearance. Make sure wheel

does not rub against the inlet.

6. Test the fan to be sure the rotation is the same as

indicated by the arrow marked Rotation.

Grille installation is described after the operation

and inspection sections.

Advertising