Lockout / tagout procedure – Wittco 580 User Manual

Page 10

Advertising
background image

H & T CABINETS

F-41013 (02-13)

9

LOCKOUT / TAGOUT PROCEDURE


Always perform the LOCKOUT / TAGOUT Procedure

before removing any sheet metal panels or attempting to service this
equipment.


The Lockout / Tagout Procedure is used to protect personnel working on an electrical appliance.
Before performing any type of maintenance or service on an electrically operated appliance, follow
these steps:

1.

In electrical box, place unit’s circuit breaker into OFF position.


2.

Place a lock or other device on electrical box cover to prevent someone from placing circuit
breaker ON.


3.

Place a tag on electrical box cover to indicate that unit has been disconnected for service and
power should not be restored until tag is removed by maintenance personnel.


4.

Disconnect unit power cord from electrical outlet.


5.

Place a tag on cord to indicate that unit has been disconnected for service and power should
not be restored until tag is removed by maintenance personnel.
















Advertising