American Electric Lighting 327 new User Manual

Caution, Ii. for 2" mast arm remove lower housing, Or ii. for 1-1/4" mast arm

Advertising
background image

327 SERIES HORIZONTAL LUMINAIRE

INSTALLATION INSTRUCTIONS

American Electric Lighting a division of Acuity Lighting Group, Inc. Conyers, GA

DRAWING NO. B61342 REV L

©2003 ACUITY LIGHTING GROUP, INC.

PART NUMBER 059-71-27178

CAUTION

!

* REQUIRES SOCKET SPACER

*

*

*

IV SHORT SEMI CUTOFF

3 & 3B

200-400W HPS ONLY

III MEDIUM SEMI CUTOFF

1 & 1B

HIGH PRESSURE SODIUM

I.

1. UN-SNAP REAR HINGE SPRING FROM BOTH SIDES OF HINGE.

2.PULL FORWARD AND UP ON LATCH.

3. SLIDE LOWER HOUSING OFF HINGE BAR.

II.

FOR 2" MAST ARM

REMOVE LOWER HOUSING

1. LOOSEN FITTER CLAMP SCREWS.

OR II. FOR 1-1/4" MAST ARM

1. REMOVE FOUR 3/8" CAP SCREWS.

2. TURN FITTER CLAMPS OVER.

3. REINSTALL FOUR 3/8" CAP SCREWS.

III.

INPUT VOLTAGE

IF THE VOLTAGE AVAILABLE IS DIFFERENT FROM THAT SHOWN ON

THE TERMINAL BOARD, CONSULT THE WIRING DIAGRAM FOR DIRECTIONS.

IV.

SOCKET POSITIONING-LIGHT DISTRIBUTION

SOCKET POSITION IS SET AT FACTORY FOR TYPE III MEDIUM SEMI CUTOFF UNLESS OTHERWISE SPECIFIED ON ORDER
WHEN ANOTHER DISTRIBUTION IS REQUIRED, SELECT VERTICAL AND HORIZONTAL SOCKET

SETTING FROM TABLE AND FOLLOW STEPS LISTED.

LAMP

CLEAR MERCURY

DELUXE MERCURY

DELUXE METAL HALIDE ONLY

TYPE

III MEDIUM SEMI CUTOFF

II MEDIUM SEMI CUTOFF

IV SHORT SEMI CUTOFF

SOCKET SETTING
HORIZONTAL

3 & 3B

1 & 1B

3 & 3B

3 & 3B

IV SHORT SEMI CUTOFF

III MEDIUM SEMI CUTOFF

II MEDIUM SEMI CUTOFF

I MEDIUM SEMI CUTOFF

II MEDIUM SEMI CUTOFF

3 & 3B

2 & 2B

1 & 1B

3 & 3B

METAL HALIDE

200-400W HPS ONLY

1. HORIZONTAL SOCKET SETTING (POSITION "B")(SEE FIG. 1)

A. REMOVE TWO SCREWS ON EACH SIDE OF SOCKET BRACKET

B. SLIDE SOCKET BRACKET TO ALLOW SCREWS TO ENTER PROPER NOTCHES FOR NEW

POSITION.

C. REPLACE AND TIGHTEN SCREWS.

2. HORIZONTAL SOCKET SETTING (POSITION "AB")(SEE FIG.2)

A. REMOVE TWO SCREWS FROM UPPER SLOT (ONE EACH SIDE).

B. POSITION SOCKET BRACKET WHERE HOLES AT "A" LINE UP WITH HOLES IN

REFLECTOR BRACKET.

C. RE-ASSEMBLE AND TIGHTEN SCREWS.

V.

FIG.1

1

2

3

A

B

HORIZONTAL SOCKET SETTING

POSITION "B"

FIG.2

1

2

3

A

B

HORIZONTAL SOCKET SETTING

POSITION "AB"

SNAPS INTO POSITION.

3. SWING LOWER HOUSING UP TO UPPER HOUSING AND PRESS FIRMLY UPWARD UNTIL LATCH

2. SNAP HINGE SPRING OVER HINGE BAR AND UNDER HINGE STUD ON EACH END OF HINGE.

1. SLIDE LOWER HOUSING OVER UPPER HOUSING HINGE BAR.

INSTALLING LOWER HOUSING

VI.

4. REPEAT 3 AS NECESSARY UNTIL UNIT IS LEVEL

TIGHTEN TWO FRONT CAP SCREWS.

3. LOOSEN TWO REAR CAP SCREWS AND

OR FRONT END HIGH

5. TORQUE BOLTS TO 15-20 FT.LBS.

4. REPEAT 3 AS NECESSARY UNTIL UNIT IS LEVEL

TIGHTEN TWO REAR CAP SCREWS.

3. LOOSEN TWO FRONT CAP SCREWS AND

FRONT END LOW

2. TIGHTEN ALL FOUR FITTER CAP SCREWS, TO 15-20 FT.LB. TORQUE.

1. PLACE LEVEL ON LEVEL BOSSES.

TWO WAY LEVEL BOSSES ARE PROVIDED ON TOP OF UPPER HOUSING.

LEVELING

IT IS NEVER NECCESSARY

OR ADVISABLE TO SLAM

THE HOUSING CLOSED

Advertising