3 installation, 1 space requirements, 2 installation process – Beijer Electronics iX Panel TA70 EN User Manual
Page 10: Space requirements, Installation process, 3installation
Advertising

Installation
3
Installation
3.1 Space Requirements
•
Installation plate thickness: 1.5 - 9.0 mm (0.06 - 0.35 inch)
•
Space requirements when installing the operator panel:
50 mm
154 mm
219 mm
(2.0 inch)
50 mm
(2.0 inch)
100 mm
(4.0 inch)
100 mm
(4.0 inch)
100 mm
(4.0 inch)
56 mm
(2.20 inch)
(8.62 inch)
(6.06 inch)
Caution:
The openings on the enclosure are for air convection. Do not cover these openings.
3.2 Installation Process
1. Unpack and check the delivery. If damage is found, notify the supplier.
x 4
Panel cut out 188.5 x 137.5 mm
(7.42 x 5.41 inch)
Note:
Place the operator panel on a stable surface during installation.
Dropping it or letting it fall may cause damage.
Beijer Electronics, MAEN012A
10
Advertising