¾

It must be possible to easily turn the plain bearing

pedestal 339 by hand. When raising the plain bear-
ing pedestal, a slight axial play of the plain bearing
of up to 1 mm must be felt.

¾

The axial play of the plain bearing is automatically

set during assembly.


7.8.4 Can and lantern

¾

Place the can gasket 406 in the centering on the

plain bearing pedestal 339.

¾

Mount can 159 and lantern 344.

¾

Screw the two connection screws 901/5 or the 3

setscrews 904/2 (depending on size) of the lantern
344 into the plain bearing pedestal 339 and
tighten.


7.8.5 Final assembly

¾

Secure the housing 100 with the suction nozzle

facing downwards on a workbench or worktop.

¾

Insert the housing gasket 401 into the housing

centering.

¾

Insert the unit pre-assembled as described in Sec-

tions 7.8.3 and 7.8.4 into the housing so that the
crane hook of the lantern faces the centre of the
discharge nozzle.

¾

Screw in the housing screws 901/3 with washers

554/3 and tighten.

For tightening torques, see Section 1.2.

¾

Insert flat gasket 400/1 into the centering of the

lantern 344.

¾

Place the bearing pedestal/drive magnet assembly

unit pre-assembled in Sections 7.8.1 and 7.8.2 on
the drive magnet assembly.

¾

Screw a commercially available ring bolt M 8 into

the end of the drive shaft.

Place the bearing pedestal unit on the
lantern 344 using a crane.

¾

Screw in hex. screws 901/1 with washers 554/4

and tighten.

¾

Insert plastic plugs into the tapped bores for the

jacking screws on the lantern 344.

¾

Turn the inner magnet assembly shaft by hand to

check its function. Check by looking into the suc-
tion nozzle whether the impeller turns.

7.9 Tests

The pumps are tested with water at the manufac-
turer's works if specified by the customer.
The operating data measured are documented in a
test certificate.
The following data can be checked using the pump
performance curves
:

♦ Flow rate
♦ Head
♦ Power requirement
♦ NPSHR