Edsal 1YBZ9 User Manual

Page 2

Advertising
background image

Start by taking one (1) 24” short post, one (1) 36” long
post, and one (1) post coupler, and join the two post to-
gether to create the back post. Take one (1) brace with
the shelf ledge facing up, and one (1) long 36” post and
attach the rivets of the brace to the top two (2) holes of
the 36” long post. Take the back post and attach the op-
posite rivets of the brace to the holes of the back post so
the brace is level. Tap brace down to seat. Attach the
bottom brace to the front 36” post skipping one (1) hole
from the bottom and the opposite end to the back post,
tap brace down to seat. Take one (1) drawer mount and
skip one (1) hole from the top brace and attach rivets

to the short and long post, tap down to seat. Take one
(1) drawer slide and insert it into the slide of the drawer
mount. Repeat steps for the opposite end assembly.

Assembly Instructions for Heavy Duty 1 Drawer Work Bench

Assembly Instructions for Heavy Duty 1 Drawer Work Bench

Assembly Instructions for Heavy Duty 1 Drawer Work Bench

Take four (4) beams with the bend facing up, and at-

tach the rivets even with the braces from the two end
assembly's, and tap down to seat. Install the top shelf
support by installing the rivets to the back post using the
top two (2) holes. Install one (1) beam with the bend
facing down
, to the top holes of the back posts, even

with the rivets from the top shelf. Next install a peg
board bracket to the back beam of the top assembly us-
ing the nuts and bolts provided. Add the final peg board
brackets and one (1) shelf support to the top two (2)
beams using the nuts and bolts provided. Add the final
shelf support to the bottom two (2) beams using the nuts
and bolts provided.

Place the peg board to the inside of the back post of the work
bench. Align the holes of the peg board to the holes on the
back post, and fasten using the nuts and bolts provided.
Align the holes on the peg board brackets to the holes of the
peg board, and fasten the peg board to the peg board brack-
ets using the nuts and bolts provided. Take the two (2)
drawer shelf braces and with the shelf ledge facing down,
insert the two (2) rivets into the two (2) holes located on the
drawer slides, for the front and back of the drawer.

Add the wood shelves to the top shelf support, the draw-
ers, the bottom shelf, and the work surface to finalize the
assembly of the workbench.

Step

1

Step

2

Step

3

Step

4

Drawer Mount

Drawer Slide

Long Post

Front 36” Long Post

Short Post

Back Post Assembly

24” Brace

Top Shelf Support

Beam

(Bend facing down)

Beams

(back side also)

Peg Board Bracket

Shelf Support

Post
Coupler

Long Post

(Top 36”)

Short Post

(Bottom 24”)

Peg Board

Drawer Shelf Braces
(Bend facing down)
(Back side also)

Shelf Ledge Up

Skip Hole
From Bottom

Tap Lightly

Advertising
This manual is related to the following products: