Machine set up – Mittler Bros Machine & Tool 400-VSUADJ User Manual
Page 6

- 6 -
MACHINE SET UP
1. Remove cardboard box and upper wood frame work from shipping crate.
2. Unbolt the Ultimate Tubing Notcher from the crate base by removing the four (4) bolts.
3. Remove the protective plastic film from the chip shield.
4. Install the Crank Handle Knobs using the supplied shoulder bolts.
5. Lift the Ultimate Tubing Notcher from the crate using a hoist and
slings positioned as shown below.
CAUTION MACHINE WAYS
ALMOST 400 POUNDS.
6. Place the machine on your bench, stand or the optional 400-A400 Roller stand. If
mounting on your own bench or stand be sure to secure the unit with 3/8” diameter bolts
being sure that the bench or stand can support 400 lbs. If you are using the optional
roller stand follow the instructions on
page 21 of this manual.
#4
Shoulder Bolts
#1 1/2” Allen Bolt
from Bottom of Stand
#2
Unbolt from shipping
crate.
#4
Crank Handle Knobs
Using A Hoist