Stacking instructions – Alto-Shaam Cook & Hold Oven Electronic Control 500-TH/III User Manual

Page 12

Advertising
background image

pg

. 10

TH/III

InsTallaTIon

/

operaTIon

/

servIce

manual

I N S T A L L A T I O N

STAcKINg INSTRUcTIONS

1) If the two appliances were shipped together from the factory, the top unit will have the casters

already removed. A stacking kit will be included with the shipment.

If casters need to be removed: lay the unit on its back, and remove the set screw on each caster. Pull the casters

out of the unit.

2) while appliance is laid on its back, insert one stacking post in each of the four corners of the

upper unit. Secure the stacking posts using one screw and two fl at washers that come with the
stacking kit.

Note:

The fl ange on the stacking posts must face the outside of the unit.

3) Remove the four top mounting screws from the lower unit. place the upper appliance, which has

the stacking posts installed, on top of the bottom unit. center the top unit from front to back.
Re-install the four screws through the fl ange of the four stacking posts.

CASTER SET SCREW

TOP
MOUNTING
SCREWS

STACKING
POSTS

TOP
MOUNTING
SCREWS

Stacking configurations

Model

Can be stacked with

300-TH/III

300-TH/III or 300-S
No Stacking Hardware needed. Align dimples at top and bottom of units. It is
recommended that the legs be removed from the top unit before stacking.

500-TH/III

500-TH/III, 500-TH-II or 500-S

750-TH/III

750-TH/III, 750-TH-II, 750-S, 767-SK or 767-SK/III

1000-TH/III

1000-TH/III, 1000-SK/III, 1000-SK/II or 1000-S

Advertising
This manual is related to the following products: