UNPACKING

Unpack and inspect unit carefully to verify that everything is

intact and there are no obstructions in the chain mechanism

or any other electrical or mechanical components. Do not run

power to system at this time.

SAFETY INSTRUCTIONS

Read this before using your product.
• Read and follow all safety instructions supplied with

chemical/coolant being used in your machine tool.

• To avoid damage to the unit, check power source for proper

voltage and phase. Unit comes standard with a transformer

capable of accepting either 230V or 460V, 3 phase power.

• As in all electrical circuits, it is highly recommended that an

electric safety device such as a fusible disconnect or circuit

breaker be installed in line before unit is connected.

• Do not use an extension cord to supply bed filter system.
• Check the rotation of the pump before starting operation.

Rotation should be in a clockwise direction looking down on

the motor (arrow on pump body indicates direction).

• Ensure that all fittings and connections are properly

tightened.

• It is important that sensitive electronic equipment, be kept a

safe distance from the Magnetic Separator, such as

• personal electronic devices such as pacemakers

• computers

• magnetic media such as credit cards

• Turn off power to the unit before beginning maintenance

on the Graymills Coolant Tank, Bed Filter, or Magnetic

Separator.

• Make sure that pump is spinning freely. See “Maintenance”

instructions.

SYSTEM COMPONENTS

A Pump

Used to deliver the coolant in the tank to the machine.

B Gear Reducing Motor

Moves the filter media along as necessary.

C Liquid Level Control and Filtration

Float switch mechanism detects the level of coolant collected

in the filter valley. Switch operates the motor that moves the

filter media along when level is too high.

D Diffuser Tray

Collects larger particles before the coolant is deposited

on the filter media. Also helps spread deposits evenly,

increasing media life.

E Filter Media

Collects the particles to filter the coolant. Standard roll

is 150 yards, rated at 20 micron. Other micron ratings

available; contact Graymills for details.

F Sludge Box

Used to accumulate spent filter media and prevent run off to

floor.

G (Optional) Magnetic Separator

Removes ferrous material from coolant before fluid enters bed

filter or tank. Can be installed directly on bed filter for dual

stage separation, or run independently with pumping system.

UNIT SET UP

1 Verify operating voltage and make any necessary changes

to the connections to the transformer in the control box as

well as the pump. The unit is a dual voltage system and

the default setting should be 230V/3Ph. Follow the wiring

schematics on the transformer and pump to check/change

the power settings. Refer to Figures at bottom of page 3.

All electrical connections should conform to national/local

codes and be made by qualified personnel.

2 Position the unit in the area in which it will be operating.
3 Remove diffuser tray and lids from paper compartment and

chain area.

4 Fill the tank cavity with coolant until level is approximately

1 to 2 inches below side wall of tank, being careful not to

overfill.

5 Proceed to feed paper through the opening at the bottom of

the paper compartment and onto the chain until the chain

is completely covered. Extend filter media a few inches past

the chain. Position the sludge collection box at the end of the

tank and place end of filter paper over box so soiled media

drops into box.

6 Replace lids and reinstall diffuser tray.
7 Pump and bed filter may be wired separately in the event

there is a power feed from your machine tool to incorporate

the pump operation into the main control. If not, you may

run a water-tight conduit (customer supplied) from the pump

to the main control box and bring your main power feed

into it for a central connection. All electrical work must be

according to applicable codes.

8 Make the necessary connections as shown in the wiring

schematic, Figure 3. All electrical work must be according to

applicable codes.

9 Complete any other necessary installations to finish the hook

up. This includes attaching hoses and fittings (customer-

supplied) from the pump discharge to the machine tool. The

BFTS40 system has a 1/2” pump discharge; the BFTS80

and BFTS120 systems have a 3/4” pump discharge; the

BFTS160 system has a 1” pump discharge. Do not reduce

the outlet of the pump. Doing so will reduce the flow

capacity of the pump. Also plumb the return lines so they are

discharging directly onto the diffuser plate of the Bed Filter

or intake of the Magnetic Separator.

795-92645 03-13 Bed Filter/Magnetic Separator OMI