DuraVent Venting System For Direct Vent Pro User Manual

Page 14

Advertising
background image

14

Figure 15

roofline. Galvanized Pipe and Elbows

may be utilized in the attic, as well as

above the roofline. The galvanized

finish is desirable above the roofline,

due to higher corrosion resistance.

Notes:

(1) If exact lengths or distances must

be met between Elbow offsets or

elsewhere, use the Pipe Extensions

to adjust onto standard Pipe Sections

(Fig. 15).

(2) If an offset is necessary in the attic

EXTENSION

PIPE

SECTION

PIPE

to avoid obstructions, it is important to

support the vent pipe in order to avoid

excessive stress on the Elbows. Wall

Straps or plumbers tape may be used

for this purpose (Fig. 16).

(3) Wherever possible, use 45°

Elbows instead of 90° Elbows. The

45° Elbow offers less restriction to the

flow of flue gases and intake air.

Step 7. Slip the Roof Flashing over

the Pipe Section(s) protruding through

the roof. Use a non-hardening sealant

between the Roof Flashing and the

roofing to prevent water leakage.

Secure the base of the Roof Flashing

to the roof with roofing nails. Ensure

the roofing material overlaps the

top edge of the Roof Flashing (Fig.

18). Verify that you have at least the

minimum clearance to combustibles at

the roofline and in the attic.

Step 8. Continue to add Pipe Sections

until the height of the system (before

adding the Cap) meets the minimum

building code requirements as

described in (Table 3 and Fig. 17).

Note that for steep roof pitches, the

vent height must be increased. In

high wind conditions, nearby trees,

Figure 14

JOISTS

CEILING

CUT

AND FRAME

DECORATIVE

COVER

1 1/2"

WOOD SCREWS

SUPPORT

CEILING

FRAMING

JOISTS

CEILING

CUT

AND FRAME

DECORATIVE

COVER

1 1/2"

WOOD SCREWS

SUPPORT

CEILING

FRAMING

Advertising