Parts & assembly, En g li s h – Nostalgia Electrics KEG6000BLK User Manual

Page 8

Advertising
background image

E

N

G

LI

S

H

6

PARTS & ASSEMBLY

Read assembly instructions carefully before installing the KEGORATOR.

Once the unit is laid on its back, the coolant in the refrigeration unit is shifted. The coolant

in the refrigeration unit needs to stabilize before the power is turned on. Allow the

kegorator to stand in an upright position for about 8 hours before turning on the power.

CO2 Tank

Band

2.5lb CO2

Tank

Keg

Coupler

Tap Tower

Washers (2)

Hose

Clamps (3)

Wrench tool

Regulator

Railing

CO2 Hose

Drip Tray

Casters (2 with Locking

Mechanism, 2 without)

Wire Rack

Tap tower

Handle

Tap Tower Nut

Tap

tower

hose

Copper

Tube

Faucet

Advertising