Vollrath Hot Cold Drop-ins User Manual
Page 4

C
ountertop
W
arming
and
d
isplay
O
peratOr
’
s
M
anual
4
17. Cut and install the drain tubing (C), “T” fittings (D) and clamps (B) as
needed and route to drain. See Figure 6.
B
D
A
B
C
Figure 6. Drain Tube, Clamp and “T” Fitting.
18. Tighten all clamps.
19. Install the unit, read and follow the Operator’s Manual instructions for safe
and correct use.
20. Pour 1/4 cup of clean fresh water into each well drain. Switch the mode
control to refrigeration. See Operator’s manual. Turn the power switch to
the “ON” mode. Water should drain. Repeat for all wells.
Installation of Manual Drain Model Kits:
1. Turn power switch to the “OFF” position and unplug from power
source.
2. Remove all water from the wells.
C
B
D
A
B
Figure 7. Water Reservoir and Well Assembly.
3. Cut and install the drain tubing (C), “T” fittings (D) and clamps (B) as
needed and route to drain. See Figure 7.
4. Tighten all clamps.
5. Install the manual “drain plug(s)” provided in the well bottoms to hold
water in the wells. See operation of manual drain plug on following
page.
6. Wait until the water in the well has completely cooled before removing
the manual “drain plug(s)”.