Ideapad v360 hardware maintenance manual – Lenovo IdeaPad V360 User Manual

Page 64

Advertising
background image

60

IdeaPad V360 Hardware Maintenance Manual

Note: Applying labels to the base cover

The new base cover FRU is shipped with a kit containing labels of several

kinds. When you replace the base cover, you need to apply the following

label:

The following labels need to be peeled off from the old base cover, and need

to be put on the new base cover.

a

Wistron Label

b

COA label

c

Rating Label

d

PRC/MTM Label

e

ECC Label

f

Malaysia Homologation Label

g

Malaysia Sirim Label (bluetooth)

h

WLAN Label

i

Brazil Label (BT) or BT Label for US/CA/TW

j

PPT Label

For some models, you also need to apply one or two FCC labels. Check the

old base cover; if it has one or two FCC labels, find duplicates of them in the

label kit and apply them to the new base cover.

For the location of each label, refer to the following figure:

a

b

d

e

f

g

h

j

i

a

c

Advertising