Pre-installation procedure – APC SMART-UPS RT SURTA48XLBPJ User Manual

Page 2

Advertising
background image

Pre-installation Procedure

2

Smart-UPS RT SURTA48XLBP/SURTA48XLBPJ External Battery Pack User Manual

4. Place the battery pack where it will be used.

– Ensure that air vents on the front and rear of the unit are not blocked.
– Do not operate the battery pack where there is excessive dust or the temperature or humidity

are outside the specified limits.

Pre-installation Procedure

1. Once the battery pack is at the installation site, remove the top cover  and battery modules 

to lighten the load and prepare the battery pack to be installed in a tower or rack-mount
configuration.

2. To disengage the battery from the chassis, push the battery tabs  inward.

3. Go to the installation procedures to install the UPS and battery pack as a tower  (page 3) or in a

rack-mount  (page 5) configuration.

2.5

cm

2.5

cm

40°C

104°F

0%

95%

Advertising
This manual is related to the following products: