I n sta l l at i o n – Belkin F1DA104T User Manual

Page 16

Advertising
background image

14

Installation

Before You Begin:

1. Make sure that all computers are powered off and that each PRO2 has

been assigned a unique BANK address.

2. Place Master and Slave switches in the desired location. Make sure all

are turned off and unplugged from the power source.

3. Connect the Console monitor, keyboard, and mouse to the Console

ports of the Master switch or Bank 00, as described previously in this
installation guide.

Connecting the Master Switch to the First Slave Switch:

4. Using the daisy-chain cable (F1D108-CBL), connect one end of the cable

to the “Master Input/Slave Output” port on the Master switch (BANK 00).

5. Connect the other end of the daisy-chain cable to the “Master Input/Slave

Output” port of the first Slave switch (BANK 01).

Adding Additional Slave Units:

6. Using the daisy-chain cable (F1D108-CBL), connect one end of the cable

to the available daisy-chain port labeled “Slave Input” on the Slave switch
(for example, BANK 01).

7. Connect the other end of the daisy-chain cable to the “Master Input/Slave

Output” port of the Slave switch that you are adding
(for example, BANK 02).

8. Repeat steps 6 and 7 for additional PRO2s you wish to

daisy-chain together.

I N STA L L AT I O N

Advertising