Installation instructions, Step 1: rough in, Continue – Bradley Smoker EXPRESS SS-3/AST/JUV User Manual

Page 5

Advertising
background image

Express® Lavatory System SS-Series

Installation Instructions - For Service Only

SS-3/AST/STD, SS-3/AST/JUV

5

Bradley Corporation • 215-1238 Rev. C; EN 03-813

5/11/04

Installation Instructions

Step 1: Rough in

Note: See Figure 1a below (for Standard Height) and Figure 1b on page 6 (for Juvenile Height)
when roughing in the Express®.

IMPORTANT: Flush the supply lines before making connections. Debris in supply

lines will cause the valves to malfunction.

IMPORTANT: Dimensions shown in Figure 1a are for Standard Height and in

Figure 1b for Juvenile Height.

1. Rough in 1/2" NPT hot and cold supply lines through wall at dimensions shown.

2. Rough in 1-1/2" NPT drain waste connection through wall at dimensions shown.
3. Install (8) 3/8" wall anchors with a minimum pull-out rating of 1,000 lbs. (supplied by

installer) at the locations shown in Figures 1a and 1b.

(MM)

32"

(813)

28-5/8"

(727)

23-1/2"

(597)

11-3/8"

(289)

(8) 3/8" WALL
ANCHORS WITH
MINIMUM PULLOUT
RATING OF 1,000
LBS.

38-1/2"

(978)

24-3/8"

(619)

2-3/4"

(70)

17-7/16"

(443)

38-1/2"

(978)

24-3/8"

(619)

4-3/8"

(111)

1/2" NPT HOT AND
COLD SUPPLIES
OR TEMPERED
SUPPLY - STUB
OUT 2" (50) FROM
WALL

Finished
Floor

CENTERLINE

15-1/4"

(387)

1-1/2" NPT DRAIN -
STUB OUT 3-1/2"
(89) FROM WALL

Figure 1a

SS-3/AST/STD Express® Lavatory System (Standard Height)

Installation Instructions

continue . . .

Advertising
This manual is related to the following products: