Economical crane assignment logistic – Liebherr LTM 11200-9.1 User Manual
Page 14
Advertising
![background image](/manuals/520710/14/background.png)
S2596
LTM 11200-9.1
14
Economical crane
assignment logistic
A multitude of heavy duty crane operations can be per-
formed with a small number of transportation vehicles.
For the erection of a wind power plant with a hub height
of 80 m and a component weight of up to 80 t for example
only four transportation units are necessary:
Crane LTM 11200-9.1 – self propelled
Transport of telescopic boom T7 – 100 m
Transport of the Y-suspension plus 30 t ballast
Transport of 52 t ballast incl. base plate
Advertising