Blount ICS 613GC User Manual
Page 27
Advertising

F/N 71537 Oct 07
© 2007 ICS, Blount Inc.
TITLE
613GC SERVICE MANUAL
25
8. STARTER
8.10 Inspect pulley spring catch.
A Clean with cleaning solution.
B Replace if worn or broken.
8.11 Install starter rope and tie knot.
8.12 Install pulley
A Wind rope onto pulley clockwise
leaving 4-6” out.
B Make sure that the pulley spring
catch is in the spring hook.
8.13 Install center screw.
A Use blue Loctite
®
.
B Torque to 26 in-lbs. (2.9 Nm).
Advertising