Setting up your air sleep system, Air support assembly instructions, Troubleshooting tips for air chambers – InnoMax Softside Air User Manual

Page 2: Troubleshooting tips for bed assembly

Advertising
background image

SETTING UP YOUR AIR SLEEP SYSTEM

1. Unpack the Box

Take all of the components out of the box. You should have the following items:

Power Edge Support Rail System Includes:

-Attached Head/Foot Rails
-Attached Side Rail Assembly

Heavy Duty Air Chambers

Air Inflator Unit With Wired Hand Controls

Comfort Layer (Either Grey or White Material)

Mattress Cover/Pillow Top Enclosure

K or Q Split or Single T/F Foundation (Optional)

2. Your entire Adjustable Air Support System can be easily assembled.

First step, determine where your bed will be positioned
and assemble your support frame. This can be a metal
bed frame, a platform pedestal or the light weight
Versaleg™ system. Assemble the metal frame or
pedestal in the desired location and place your foundation
in the frame with the open side down. Many platform
pedestals don’t require the use of a foundation. For
VersaLeg™ assembly, place the foundation halves on
the floor with the open side up. Position the Versaleg™
plates on all four corners of each foundation half and
then place one plate on each side approximately half
way between the head and foot plates. Use four of the
provided screws to attach each plate to the foundation.

Repeat this process for the second
foundation piece. Once the plates have
been secured, twist the threaded end of
the Versaleg™ into each plate. Once all
have been inserted, simply flip the foundation over so the legs
rest upon the ground and you have the firm, flat side of the
foundation is facing up. You are now ready to begin the bed
assembly. For the assembly video of this product please visit:

www.innomax.com

or

www.youtube.com

under the channel name

InnoMaxSleep

1

AIR SUPPORT ASSEMBLY INSTRUCTIONS

3. Unfold the mattress enclosure and completely unzip the cover.

Insert the head and foot rail inside the cover. The head of the bed should be marked
as head rail and will have two slits in the black webbing material. This is for the exit
of your air chamber hoses. The side rails are inserted in between the head and foot
rails with the webbing as smooth as possible. Make sure the webbing does not run
under the rails to the other side of the bed (see DIAGRAM

A1

). Doing so will make the

black webbing too short. The black webbing (see DIAGRAM

A2

) shows proper installation.

(Please see next page for diagram A1 & A2)

SIDE RAILS 2ND

HEAD & FOOT RAILS

FIRST

Digital Air Inflators: Only one control operates at a time.

1.) First, make sure the connection from the pump to the air chamber is secure.

2.) Nominal changes in readout may be caused by cooling of air after filling, temperature changes
in general or may be noticed for a week or two after the system has been set up and acclimated.

3.) Switch chamber connections to pump (right to left and vice versa) then reinflate to see if the same
chamber is losing air.

4.) Reinflate air chambers then disconnect air lock connectors from pump to see if chamber holds
air.

5.) O-Ring on Pump Connectors may occasionally need to be cleaned or replaced (available a
hardware store).

*

If issue persists, contact authorized dealer for replacement.

1.) Check connectors by filling the chamber with air, disconnect the hose from the pump, then
submerge the fitting in a glass of water. If bubbles are coming out of the fitting, a small leak is
present.

*

If the connector is leaking, contact authorized dealer for replacement.

Potential Air

Loss In

Chamber

Checking

For Connector

Leaks

SUGGESTED ACTIONS

ISSUE

Troubleshooting Tips For Air Chambers

Digital Air Inflators: Only one control operates at a time.

SUGGESTED ACTIONS

ISSUE

Troubleshooting Tips For Bed Assembly

Foam Rails

Do Not

Appear To

Be The

Correct Size

1.) If installed upside down or not completely unfolded Rails will not reach top to bottom or side
to side. Properly install by inserting Top to Bottom Rails first. Slit holes in Top to Bottom sling
material should be positioned at head of bed for threading Air Hoses to Pump. Side to Side Rails
are then inserted to form dish with slit holes again positioned at head of bed. Labels adjacent to
slit holes point to headboard to confirm right side up installation. Be sure that Rails and sling
material is completely unfolded and installed right side up to verify correct size. Please note that
Rails may bow in until Air Chambers are filled.

*

If Rails do not fit after verifying slings have been completely unfolded and are being installed

right side up, contact authorized dealer for assistance.

CORRECT

6

Advertising