Steering circuit, Teering, Ircuit – Gradall 534D-6T Service Manual User Manual

Page 264

Advertising
background image

S

TEERING

C

IRCUIT

Do not hold the steering fully

turned any longer than

necessary.

5.0

STEERING FLOW DIVIDER VALVE

SET UP

1. Install a 10,000 PSI gauge, hose and adapter to the test port in

the outlet tube of the main implement pump. Make sure you can

see the gauge from the operator’s cab.

2. With the park brake engaged and the transmission in “Neutral”,

start the material handler. Retract all cylinders and bring the boom

level.

3. Make sure there is no one behind the machine and turn the

steering wheel fully in one direction until the steering bottoms.

CHECK

1. With the engine running at low idle (800-900 RPM), observe the

pressure gauge while holding the steering fully turned.

2. The gauge should read 2500 ± 100 PSI for all Models except the

544C-10 and 544D-10 which should read 3000 ± 100PSI.

ADJUST

1. If adjustment is necessary, turn the steering slightly in the

opposite direction, make sure the park brake is still engaged

and the transmission in “Neutral” and stop the engine.

2. Locate the steering flow divider valve.

3. Remove the hose and the straight adapter fitting from the

reservoir port of the valve to allow access to the relief valve

socket head adjusting screw.

4. Turn the screw clockwise to increase pressure; counter-clockwise

to reduce pressure.

5. Re-connect the hose and adapter fitting to the flow divider valve

and re-test.

522, 524, 532C-6, 534C-6 and 534C-6T

MAIN IMPLEMENT TEST PORT

ALL OTHER MODELS

MAIN IMPLEMENT TEST PORT

CAUTION

!

NOTE!

The location of the main

implement test port varies by

machine vintage.

Advertising
This manual is related to the following products: