Pre-load + end float = shim pack, 3 installing the air locker – ARB RD104 User Manual

Page 23

Advertising
background image

3 Installing the Air Locker

21

Figure 15.


c Consult your vehicle manufacturer’s service manual to determine

the carrier bearing pre-load amount specified for your vehicle.

c Add the specified pre-load amount to the measurement taken with

the feeler gauge to determine a shim amount for ‘D’ in Figure 13.

PRE-LOAD + END FLOAT = SHIM PACK

c Create a shim pack ‘D’ from the shims supplied with your Air

Locker.

NOTE : Do not add shims between the bearing cone and the

bearing seat of the Air Locker and NEVER machine
the Air Locker
.

c Remove the factory shim from the left-hand side.
c Install the shim pack ‘D’ between the master shim and the seal

housing as shown in Figure 13.

c Rotate the seal housing until the tube is positioned in the center of

the oil drainage notch of the aluminum housing. (Fig.16.)

Advertising