4 installing the air locker, Drilling and tapping the bulkhead port – ARB RD82 User Manual

Page 17

Advertising
background image

4 Installing the Air Locker

15

4.3

Drilling and Tapping the Bulkhead Port


An airline port must be drilled and tapped through the differential
housing to mount the bulkhead fitting into.

Mark a spot on the top of the outside shell of the differential

housing that will be clear of the ring gear position once the seal
housing tube has been installed. Figure 8. shows how the tube will
port through the differential housing.

NOTE : Higher ratio gearing uses deeper (thicker) ring gears

with teeth that extend much further. Make sure the
intended hole location is far enough away from the
ring gear teeth that the air line will not be at risk of
contact with the current or future ring gears.

Figure 8.

Cover the drive pinion and axle tube areas with a rag to protect

them from metal filings.

Drill through the housing square to the outside surface using a

11.2mm [7/16”] drill. (Figure 9.)











Figure 9.

Advertising