ARB RD149 User Manual

Page 3

Advertising
background image

Table of Contents:

1

1 Introduction

3

1.1 Pre-Installation Preparation

3

1.2 Tool-Kit Recommendations

4

2 Removing the Existing Differential

5

2.1 Vehicle Support

5

2.2 Differential Fluid Drain

5

2.3 Removing the Axles

5

2.4 Marking the Bearing Caps

6

2.5 Checking the Current Backlash Amount

7

2.6 Removing the Differential Carrier

8

3 Installing the Air Locker

9

3.1 Mounting the Ring Gear

9

3.2 Installing the Carrier Bearings

10

3.3 Drilling and Tapping the Bulkhead Port

11

3.4 Assembling the Seal Housing

12

3.5 Setting the Backlash

13

3.6 Setting up the Bulkhead Fitting

15

3.7 Profiling the Seal Housing Tube

17

3.8 Bench Testing the Air Locker

18

3.9 Reinstalling the Differential & Axles

19

4 Installing the Air System

20

4.1 Mounting the Solenoid

20

4.2 Running & Securing the Air Line

22

4.3 Connection to the Bulkhead Fitting

23

5 Mounting & Connecting the Electrical System

25

5.1 Mounting the Actuator Switch(es)

25

5.2 Wiring the Actuator System

26

6 Testing & Final Assembly

29

6.1 Leak Testing

29

6.2 Testing the Air Locker Actuation

29

6.3 Filling the Differential

30

6.4 Post-Installation Check List

31

7 Parts List

33

7.1 Exploded Assembly Diagram

33

7.2 Itemized Parts List

34

Advertising