Hanging instructions sediment trap assembly, Fig. 3, Fig. 4 – L.B. White AD250 User Manual

Page 10: Fig. 5

Advertising
background image

1.

Assemble according to the illustration and tighten all
eyebolts securely. See Fig. 3.

FIG. 3

2.

Be sure heater is securely fastened and is hanging
level. (Check crosswise and lengthwise.)

3.

See Fig. 4 for typical indoor installation. In any animal
confinement building, consideration must be given to
making sure the heater is located away from the
livestock so that livestock cannot knock the heater,
tear it loose from its mounting, or damage the heater
or its gas supply line in any way. Make sure you
observe and obey minimum clearance distances to
combustible materials as stated in the specification
section of this owner’s manual and on the heater
itself.

FIG. 4

Assemble the tee, nipples and cap together and tighten
securely. See Fig. 5. The sediment trap assembly must
always be mounted in a vertical position. Make sure pipe
thread compound that is resistant to both L.P. gas and
natural gas is used in making all connections. Check all
connections for gas leaks using approved gas leak
detectors.

FIG. 5

9

HANGING INSTRUCTIONS

SEDIMENT TRAP ASSEMBLY

NIPPLE

HOSE ADAPTER

TEE

NIPPLE

CAP

TO GAS CONTROL

VALVE INLET

EYEBOLT

NUT

FLAT WASHER

CAGE NUT

CHAIN

CASE TOP

NOTE: REGULATORS SHOULD ALWAYS BE MOUNTED OUTDOORS. IF
CIRCUMSTANCES FORCE INSTALLING THE REGULATOR INDOORS,
THE REGULATOR'S VENT MUST BE VENTED OUTDOORS USING VENT
LINE NO SMALLER THAN VENT OPENING.

VENT OF REGULATOR MUST
POINT DOWN AND REGULATOR
MUST BE VENTED OUTDOORS

MANUAL SHUT-OFF VALVE
CAN BE INSTALLED BEFORE
THE REGULATOR, UNDER
THE EAVE OF THE BUILDING,
OR AFTER THE REGULATOR
INSIDE THE BUILDING.

OPTIONAL INDOOR
REGULATOR
MOUNTING LOCATION

GAS HOSE

THERMOSTAT
CORD

YOKE

HEATER

1 FT.

BLACK PIPE
THROUGH WALL

VENT LINE

WALL OUTLET

POWER CORD

SEDIMENT
TRAP

L

L

A

W

1 FT.

NOTE: REGULATORS SHOULD ALWAYS BE MOUNTED OUTDOORS. IF
CIRCUMSTANCES FORCE INSTALLING THE REGULATOR INDOORS,
THE REGULATOR’S VENT MUST BE VENTED OUTDOORS USING VENT
LINE NO SMALLER THAN VENT OPENING.

REGULATOR VENT MUST
POINT DOWN

OPTIONAL INDOOR

MOUNTING LOCATION

GAS HOSE

PIPE THROUGH WALL

VENT LINE

WALL OUTLET

POWER CORD

SEDIMENT TRAP

AIR DIVERTER

1 FT. MIN.

1 FT.
MIN.

W

ALL

HEATER

MANUAL SHUT OFF VALVE CAN BE
INSTALLED BEFORE THE REGULATOR
UNDER THE EAVE OF THE BUILDING,
OR AFTER THE REGULATOR INSIDE
THE BUILDING.

Advertising