Gas train assembly, Fig. 3, Fig. 4 – L.B. White I-17 Infraconic Spark Ignition User Manual
Page 10: Fig. 5

BUSHING
RIGID END
OF HOSE
TO GAS
SUPPLY
VALVE, SHUT-OFF
CONNECT HOSE TO GAS
INLET, TIGHTEN SECURELY
STANDARD HOSE
GAS TRAIN ASSEMBLY
9
FIG. 3
This heater is supplied with one of the following gas train
assemblies. Refer to the appropriate illustrations.
1/8 NPT FITTING KIT, PART #23406
A
B
NUT
STEM
- ASSEMBLE FITTING
FITTING ASSEMBLY
CONTROL VALVE
INLET
- ATTACH FITTING TO GAS INLET
& TIGHTEN SECURELY.
- CONNECT APPROVED GAS HOSE ASSEMBLY
WITH APPROPRIATE CONNECTIONS TO 1/8 NPT
FITTING.
FIG. 4
A
B
C
HOSE & QUICK COUPLING KIT
COLLAR
MALE END
COUPLING
VALVE
SHUT-OFF
TO GAS
SUPPL
Y
BUSHING
NIPPLE
DUST CAP
- ASSEMBLE COUPLING KIT, PART #21335,
& TIGHTEN COMPONENTS SECURELY.
- CONNECT TO GAS SUPPLY.
- PULL BACK COUPLING COLLAR.
- FIRMLY PUSH MALE HOSE END
INTO COUPLING
- RELEASE COLLAR. ENSURE
MALE HOSE END IS SECURELY
LOCKED INTO COUPLING.
CONNECT HOSE TO GAS INLET
& TIGHTEN SECURELY
FIG. 5