Installation instruc tio ns – Poison Spyder TJ FULL CAGE KIT User Manual

Page 6

Advertising
background image

INSTALLATION INSTRUC

TIO

NS

Poison Spyder Customs • TJ FULL CAGE KIT INSTALL

Page 6

©2010 POISON SPYDER CUSTOMS, INC. • 951-849-5911 • WWW.POISONSPYDER.COM

FIGURE 14

15. Install any optional equipment at this time,

such as Entry Grab Handles, Seat Belt Bung

Kit, etc.

16. Fully test-fit all equipment that is located

within, near or around the cage or any

portion of the cage. This includes soft tops,

doors, seats, etc. Test each component for

both fit and operation. It is EXTREMELY

IMPORTANT that you verify proper fitment

of all components at this time. If any tube

placement needs to be adjusted, it is a

simple matter of grinding the small tack

welds to make any adjustments. Making

these adjustments will be impossible once

the cage is fully welded.

17. Finish-weld each joint in the cage. Before

you begin, you may wish to place welding

blankets or some other suitable protection

for your Jeep’s interior. You may not be able

to easily reach every area you need to weld

while the cage is still installed in the Jeep,

but we recommend doing as much as you

can while the Cage is still in the Jeep, to

discourage deformation during welding.

FIGURE 15

18. Remove the cage from the vehicle to finish

any welds that couldn’t be reached before.

FIGURE 16

19. Paint or powder-coat your cage to protect

it from rust. If painting it yourself, use a good

quality self-etching primer on the bare steel

of your cage prior to painting in the color of

your choice.

20. Re-install the cage into the Jeep and

properly tighten all fasteners. Use the

supplied 1/2-13 Gr8 hex head cap screws,

washer plates and nylon-insert lock nuts to

secure the bottom foot of each Lower A-Pillar

to the existing hole in the floorboard of the

Jeep.

Congratulations, you have completed the

installation of your Poison Spyder Full Cage Kit!

Advertising