Installation instruc tio ns – Poison Spyder TJ FULL CAGE KIT User Manual
Page 6

INSTALLATION INSTRUC
TIO
NS
Poison Spyder Customs • TJ FULL CAGE KIT INSTALL
Page 6
©2010 POISON SPYDER CUSTOMS, INC. • 951-849-5911 • WWW.POISONSPYDER.COM
FIGURE 14
15. Install any optional equipment at this time,
such as Entry Grab Handles, Seat Belt Bung
Kit, etc.
16. Fully test-fit all equipment that is located
within, near or around the cage or any
portion of the cage. This includes soft tops,
doors, seats, etc. Test each component for
both fit and operation. It is EXTREMELY
IMPORTANT that you verify proper fitment
of all components at this time. If any tube
placement needs to be adjusted, it is a
simple matter of grinding the small tack
welds to make any adjustments. Making
these adjustments will be impossible once
the cage is fully welded.
17. Finish-weld each joint in the cage. Before
you begin, you may wish to place welding
blankets or some other suitable protection
for your Jeep’s interior. You may not be able
to easily reach every area you need to weld
while the cage is still installed in the Jeep,
but we recommend doing as much as you
can while the Cage is still in the Jeep, to
discourage deformation during welding.
FIGURE 15
18. Remove the cage from the vehicle to finish
any welds that couldn’t be reached before.
FIGURE 16
19. Paint or powder-coat your cage to protect
it from rust. If painting it yourself, use a good
quality self-etching primer on the bare steel
of your cage prior to painting in the color of
your choice.
20. Re-install the cage into the Jeep and
properly tighten all fasteners. Use the
supplied 1/2-13 Gr8 hex head cap screws,
washer plates and nylon-insert lock nuts to
secure the bottom foot of each Lower A-Pillar
to the existing hole in the floorboard of the
Jeep.
Congratulations, you have completed the
installation of your Poison Spyder Full Cage Kit!