Synergy 8519 - 2.5" Shock Towers for 03+ Dodge Trucks User Manual

Page 8

Advertising
background image

14) Torque the 7/16” bolts to 50 ft-lbs.
15) Install the coil spring with the coil spring isolator on top. Just how it was

removed.

16) Reinstall the stock lower shock bolt and torque to 100 ft-lbs.
17) Torque the upper shock bolt to 120 ft-lbs.
18) Reinstall the battery trays, batteries and intake in the reverse order of removal.

Take note, reinstallation of the battery trays can be tricky with the towers in place,
but it is doable. If additional trimming is necessary, trim as needed for
reinstallation.

19) Next trim the plastic inner fender wells to clear the towers, resi and hose. In this

installation, we used PPM-8542-02-01 front reservoir mounts to secure the
reservoirs to the coil buckets.

Advertising