Snorkel TM12-sn51941+ User Manual

Page 13

Advertising
background image

Operation Manual

Page 10

Maintenance

M

AINTENANCE

W A R N I N G

!

!

Never perform service while the platform is elevated without first blocking the elevating assembly.

DO NOT stand in the elevating assembly area while deploying or storing the brace.

Figure 7: Supporting the Elevating Assembly

B

L O C K I N G

T H E

E

L E V A T I N G

A

S S E M B L Y

I

NSTALLATION

1. Park the machine on firm level ground.

2. Verify that both Emergency Stop Switches are ON.

3. Turn and hold the Chassis Key Switch to CHASSIS.

4. Position the Chassis Lift Switch to UP and elevate the platform

approximately 1,2 m (4 ft.).

5. Place a solid wood block, 51mm x 100mm x 45cm (2”x 4”x18”)

between the second mast section and Chassis just behind the
mast assembly.

6. Push the Chassis Lift Switch to the DOWN position and gradually

lower the platform until the second mast section is supported by
the block.

R

EMOVAL

1. Push the Chassis Lift Switch to the UP position and gradually raise platform until the wood block can be

removed.

2. Remove the block.

3. Push the Chassis Lift Switch to the DOWN position and completely lower the platform.

H

Y D R A U L I C

F

L U I D

The hydraulic fluid reservoir is located in the chassis door.

Figure 8: Hydraulic Fluid Reservoir and Dipstick

NOTE: Never add fluid if the platform is elevated.

C

HECK

H

YDRAULIC

F

LUID

1. Make sure that the platform is fully lowered.

2. Open the chassis door.

3. Remove the filler cap from the hydraulic fluid reser-

voir.

4. Check the fluid level on the dipstick on the filler cap.

5. Add the appropriate fluid to bring the level to the FULL

mark. See “Specifications” on page 14

Number 2 Mast

Wood Block

Advertising