Reventative, Aintenance, Eport – Snorkel XRT27 Electric-sn1000+ User Manual
Page 11

Page 11
X27 Electric
Table 1: Preventative Maintenance Checklist
P
REVENTATIVE
M
AINTENANCE
K
EY
Interval
Daily=each shift or every day
50h/30d=every 50 hours or 30 days
250h/6m=every 250 hours or 6 months
1000h/2y=every 1000 hours or 2 years
Y=Yes/AcceptableN=No/Not Acceptable
R=Repaired/Acceptable
P
REVENTATIVE
M
AINTENANCE
R
EPORT
Date:________________________________________
Owner: ______________________________________
Model No: ____________________________________
Serial No: ____________________________________
Serviced By: __________________________________
Service Interval: _______________________________
COMPONENT
INSPECTION OR SERVICES
INTERVAL
Y
N
R
Batteries
Check electrolyte level
6m
Check specific gravity
6m
Clean exterior
6m
Check battery cable condition
Daily
Clean terminals
6m
Engine Oil and
Filter
(Bi-Energy)
Check level and condition
Daily
Check for leaks
Daily
Change oil filter
200h
Engine Fuel
System
(Bi-Energy
Check fuel level
Daily
Check for leaks
Daily
Replace fuel filter
400h/6m
Check air cleaner
Daily
Replace air cleaner element (Diesel)
Yearly
Check Intake Air Line (Diesel)
200h
Engine
Coolant
(Bi-Energy
Check coolant level (with engine cold)
Daily
Replace coolant
3m
Check Hoses and Clamps
200h
Hydraulic Oil
Check oil level
Daily
Change filter
6m
Drain and replace oil
2y
Hydraulic
System
Check for leaks
Daily
Check hose connections
30d
Check hoses for exterior wear
30d
Emergency
Hydraulic
System
Operate the emergency lowering valve and
check for serviceability
Daily
Control Handle
Check switch operation
Daily
Control Cable
Check the exterior of the cable for pinching,
binding or wear
Daily
Platform Deck
and Rails
Check fasteners for proper torque
Daily
Check welds for cracks
Daily
Check condition of deck
Daily
Tires
Check for damage
Daily
Check lug nuts (torque to 90 ft. lbs.)
30d
Hydraulic
Pump
Wipe clean
30d
Check for leaks at mating surfaces
30d
Check for hose fitting leaks
Daily
Check mounting bolts for proper torque
30d
Drive Motors
Check for operation
Daily
Steering
System
Check hardware & fittings for proper torque
6m
Grease pivot pins
30d
Oil king pins
30d
Check steering cylinder for leaks
30d
Elevating
Assembly
Inspect for structural cracks
Daily
Check pivot points for wear
30d
Check mounting pin pivot bolts for proper
torque
30d
Check elevating arms for bending
6m
Chassis
Check hoses for pinch or rubbing points
Daily
Check component mounting for proper
torque
6m
Check welds for cracks
Daily
Lift Cylinder
Check the cylinder rod for wear
30d
Check mounting pin pivot bolts for proper
torque
30d
Check seals for leaks
30d
Inspect pivot points for wear
30d
Check fittings for proper torque
30d
Entire Unit
Check for and repair collision damage
Daily
Check fasteners for proper torque
3m
Check for corrosion-remove and repaint
6m
Lubricate
30d
Labels
Check for peeling, missing, or unreadable
labels & replace
Daily
COMPONENT
INSPECTION OR SERVICES
INTERVAL
Y
N
R