Securing for day 8-6, Securing for day, 8-6, Securing for day -6 – Snorkel MHP34J User Manual
Page 50: Operation, Securing for day
Advertising

Figure 8.12 - Platform Control Box Operation
Platform Moving Switch Illustration
■ Securing for Day
At the end of each work day the MHP12/34J should
be re turned to the STOWED POSITION and locked
as de scribed un der “Stowing” in the "Stowing and
Trans porting" chap ter 10.
page 8 - 6
MHP12/34J – 11447A
8. Operation
JIB
BOOM
3. Jib Boom
5. Platform Rotation
UP
UPPER
BOOM
2. Upper Boom
UP
DOWN
DOWN
SLEW
4. Slew
LEFT
RIGHT
ROTATE
PLATFORM
LEFT
RIGHT
1. Lower Boom
LOWER
UP
DOWN
BOOM
Advertising
This manual is related to the following products: