User notices (cont.) electrical requirements, Initial set-up – Bunn DUAL TM (Serial # DUAL010000 - Up) User Manual

Page 3

Advertising
background image

Page 3

Requires 2-wire, grounded
service rated 200 to 240
volts ac, 30 amp, single
phase 50 or 60 Hz.

Requires 3-wire, grounded
service rated 120/208 or 120/
240 volts ac, 30 amp, single
phase, 60 Hz.

120V A.C.

120V A.C.

120V A.C.

208 or 240V A.C.

L2 RED

L2 RED

WHITE

NEUTRAL

L1 BLACK

L1 BLACK

200 or 240V A.C.

USER NOTICES (cont.)

ELECTRICAL REQUIREMENTS

CAUTION - The brewer must be disconnected from the power source until specified in

Initial Set-Up.

Advertising