3 installation, Space requirements – Eppendorf 3100 Digital Water Bath Shake User Manual
Page 17

11
Innova 3100
M1231-0050
Operating manual
Voltage Configuration Table
Innova 3100
Catalog #
Voltage
Electrical Service Package
M1231-0001
100V 50/60Hz
M1195-0350
M1231-0000
120V 50/60Hz
M1195-0350
M1231-0002
220V 50/60Hz
M1195-0360
M1231-0003
240V 50/60Hz
M1195-0360
NOTE:
Use of the Innova shakers requires a platform, which is a separate item.
Available platforms are listed in Chapter 7.
3.3
Installation
3.3.1
Space Requirements
It is essential that the instrument be situated in an area where there is sufficient
space for the shaker and service lines (see Figure 5 below).
Figure 5: Space Requirements
The outside dimensions of the Innova 3100 are:
WARNING!
There should be enough space around the mains/power
connections to unplug the device.