Preventive maintenance & inspection schedule -3 – JLG 19AMI (3120758) Service Manual User Manual

Page 17

Advertising
background image

SECTION 2 - SERVICE PROCEDURES

3120758

– JLG Lift –

2-3

Table 2-2. Preventive Maintenance & Inspection Schedule.

AREA ON MACHINE

INTERVAL

PRE-START (1)

INSPECTION

3 MONTH

PREVENTATIVE

MAINTENANCE

6 MONTH

PREVENTATIVE

MAINTENANCE

PRE-DELIVERY (2)
OR FREQUENT (3)

INSPECTION

ANNUAL (4)

(YEARLY)

INSPECTION

MAST ASSEMBLY

7

Mast Sections

2, 5

2, 5

Chain Systems

14

3, 14

14, 25

Sequence Cable Systems

3

1, 2, 3

Covers or Shields

1

Sheave Systems

1, 2

1, 2

Bearings

1, 2

Slide Pads

1, 2

PLATFORM ASSEMBLY

7

Platform and Material Tray

1

1

Guard Rails

1, 2, 4

1, 2, 4

Gate

1, 5

1, 5

Floor

1, 2

1, 2

Lanyard Anchorage Point

1, 4

1, 4

CHASSIS ASSEMBLY

7

Front (and Rear, if equipped) Caster Wheels

1, 2

14

1, 2

1, 2

Rear Wheel Assembly

2

2

Bubble Level

1, 7

1, 7

Floor Stop Assembly

1, 3, 7

FUNCTIONS/CONTROLS

7

Platform Controls

5, 6, 7

5, 6, 7

Ground Controls

5, 6

5, 6, 14

Function Control Locks, Guards, or Detents

5

5

Function Enable System

Emergency Stop Switches (Ground & Platform)

5

Function Limit or Cutout Switch Systems

5

Manual Descent or Auxiliary Power

5

5

POWER SYSTEM

Battery

19

9

18

Battery Charger

5

HYDRAULIC/ELECTRIC SYSTEM

9

Hydraulic Pump

1, 2, 9

1, 2, 5, 9

Hydraulic Cylinder

2, 7, 9

2, 9

Cylinder Attachment Pins and Pin Retainers

1, 2

1, 2

Hydraulic Hoses, Lines, and Fittings

1, 9

1, 9

Hydraulic Reservoir, Cap, and Breather

5, 7

5, 7

Hydraulic Filter

Hydraulic Fluid *

11

11

11

Electrical Connections

20

20

Instruments, Gauges, Switches, Lights, Horn

5

Advertising