SECTION 2 - SERVICE PROCEDURES

2-20

– JLG Lift –

3120758

event that an unacceptable condition occurs, the head
should be replaced.

Piston

Visually inspect the outside surface for scratches or pol-
ishing. Deep scratches are unacceptable. Polishing indi-
cates uneven loading and when this occurs, the diameter
should be checked for out-of-roundness. If out-of-round-
ness exceeds 0.007", this is unacceptable. Check the con-
dition of the dynamic seals and bearings looking
particularly for metallic particles embedded in the bearing
and in the piston seal surface. Remove the seals and
bearings. Damage to the seal grooves, particularly on the
sealing surfaces, is unacceptable. In the event that an
unacceptable condition occurs, the piston should be
replaced.

Tube Assembly

Visually inspect the inside bore for scratches and pits.
There should be no scratches or pits deep enough to
catch the fingernail. Scratches that catch the fingernail but
are less than 0.5 inch long and primarily in the circumfer-
ential direction are acceptable provided they cannot cut
the piston seal. The roughness of the bore should be
between 10 and 20 µ inches RMS. Significant variation
(greater than 8 µ inches difference) are unacceptable. In
the event that an unacceptable condition occurs, the tube
assembly should be repaired or replaced.

Figure 2-2. Lift Cylinder Internal Component Assembly Cross-Section.

PISTON

LOCKNUT

(Torque

175-200 Ft. Lb.)

WEAR

RING

PISTON

SEAL

O-RING

O-RING

BACKUP

RING

CYLINDER

HEAD

RETAINING

RING

RETAINING RING

GROOVE

ROD

SEAL

ROD

WIPER

CYLINDER

HEAD

WHEN ASSEMBLING

CYLINDER

APPLY ANTI-SEIZE

COMPOUND

AROUND THE HEAD

IN THIS AREA ONLY

CYLINDER

TUBE

ASSEMBLY

CYLINDER

ROD