JLG 80HX_HX+6 ANSI Operator Manual User Manual
Page 34

SECTION 2 - PREPARATION AND INSPECTION
2-14
– JLG Lift –
3120270
Table 2-1. Lubrication Chart
Components
Number/Type
Lube Points
Capacity
Lube
Interval
Hours
Comments
3 Months
150 hrs
6 Months
300 hrs
1 Year
600 hrs
2 Years
1200 hrs
1
Wheel Drive Hubs
Level/Fill Plug
2.75 pt. (1/2 full)
EPGL
(SAE90)
X
Check level every 150 hours; change @ 1200
hours
2
Slave Cylinder (Rod)
1 Grease Fitting
A/R
MPG
X
3
Slave Cylinder (Barrel )
1 Grease Fitting
A/R
MPG
X
Gain access through boom fly section.
4
Platform Pivot
1 Grease Fitting
A/R
MPG
X
5
Rotating Column
(Optional)
2 Grease Fittings
A/R
MPG
X
6
Rotary Worm Gear
(Optional)
N/A
A/R
MPG
X
Brush on.
7
Platform Hinges
2 Grease Fittings
A/R
MPG
X
8
Platform Latch
N/A
A/R
EO
X
9
Boom Chain Extension
Sheave
1 Grease Fitting
A/R
MPG
X
Align access holes in mid and fly boom.
10
Swing Bearing
2 Grease Fittings
A/R
MPG
X
Remote Access
11
Lift Cylinder (Barrel End)
1 Grease Fitting
A/R
MPG
X
Remote Access
12
Master Cylinder (Barrel
End)
1 Grease Fitting
A/R
MPG
X
Remote Access
13
Master Cylinder (Rod
End)
1 Grease Fitting
A/R
MPG
X